rockhound60 Posted December 13, 2011 Report Share Posted December 13, 2011 GE offers solutions for the re-injection of produced water to the Rumaila oil field 12-12-2011 08:08 مساء Date: Monday, 12/12/2011 20:08 Citizen - Asaad Al-Mutairi ا GE Oil & Gas Confirmed the GE Oil & Gas GE Oil & Gas ability to provide customers with integrated by re-injection of produced water in the context of plans to boost productivity in the Rumaila oil field. . Said Joseph Anis, President and CEO, in the "GE Energy" in the Middle East: "we have adopted a method engineered innovative in this project, includes a full range of products GE, including pumps, engines, gas and gas systems, valves and air coolers. كم This solution also provides the additional advantage of the innovative in its design prepared to maintain the water resources in the country. " وي وأنظمة دفع الهواء. The value of the contract, "General Electric" more than $ 40 million, and includes power 10 pumps, high pressure divided axes of the water injection using 10 engines gas and 6 pumps driving function generators and two of the systems, gas supply and air conditioning as well as auxiliary equipment Kalmbirdat pneumatic control valves and systems push air. و And this equipment will be shipped during the second half of 2012. مؤكداً: زودنا شركة BP Iraq NV بب Certain: we supplied company BP Iraq NV bouquet of integrated pumps, motors and ancillary equipment for re-injection of produced water in the Rumaila oil field in southern Iraq. GE Energy” منها محركات Waukesha الغ Bently Nevada للمراقبة. To ensure all meet the technical requirements of the company BP, the "GE's oil and gas," invoking the resources of the "GE Energy GE Energy" of Waukesha gas engines and a range of products Bently Nevada monitoring. . The Convention signed between the "General Electric" company BP Iraq-NV single point of contact for the full range of equipment, and one factory for all units to ensure the compatibility of technical and business system ensures reduced time of installation, and management style high efficiency allows customers to save money and time in the management phase of the project. الج It is worth mentioning that it has been so far detected about 50 productive reservoirs of oil and gas in parts of Iraq, while Rumaila is the most productive among them. http://translate.googleusercontent.com/translate_c?act=url&hl=en&ie=UTF8&prev=_t&rurl=translate.google.com&sl=auto&tl=en&u=http://www.almowatennews.com/news_view_31391.html&usg=ALkJrhgEK9ylYA7H0tSK-l9HQwFZdcfG1w Link to comment Share on other sites More sharing options...
Recommended Posts