  • 4 weeks later...
Report reveals the magnitude of the tragedy left by the Mosul Dam in the event of its collapse
Investigations

 Since 01/11/2016 13:16 pm (Baghdad time)

58.jpg

 Translation balances News

Alhecal structural Mosul Dam is facing a new threat because of inadequate maintenance and floods due to cracking.

The New York Times, that "The more than 16 months after the restoration of Iraqi and Kurdish forces from Mosul Dam Daash, faces the structure a new threat: the danger of the collapse of the dam because of inadequate maintenance, and major flooding due to cracks that have faced the dam."

 

She added, that "in the worst scenario of events, according to officials at the State Department, an estimated 500,000 people have been killed, while it can become more than a million displaced if exposure Mosul dam to collapse, in the spring, when the course of the Tigris River inflation due to rain and melting snow that the number of deaths and the damage will be much less if the Iraqi citizens got enough warning, and if the dam suffered partial collapse if the violation in the summer or fall, when the water level is lower. "

 

The paper that "in the White House, President Obama stressed the need for emergency repairs in the call for on Wednesday with Prime Minister Haider al-Abadi, the two sides also discussed the recent developments at the hands of Iraqi security forces against Daash in Ramadi, in western Iraq, and Gen. Joseph Dunford, Chairman Joint Chiefs of Staff, stressed the urgent need to preserve the dam during a meeting with al-Abadi in Baghdad on Thursday. " 

He noted that "the dam of Mosul, Iraq's largest fields, could kill 500,000 and leaving millions homeless concern revolves around the reforms may not come in time, and US officials urged the Iraqi government to start warning its citizens, including those living under the control of Daash terrorist in Mosul, about precautions to be taken and where to flee if the actual dam began to collapse. "

 She noted that "in the heart of the problem is a major engineering challenge strengthening the huge dam built in the era of the buried Saddam Hussein on the weak of gypsum, limestone, clay Cretaceous basis but the problem is political, as well as the increased risks described by US officials comes as al-Abadi claims with budget shortages, conflict Daash with the ongoing challenges to his authority from political opponents and by hard-liners see the American proposals as a plot to expand Western influence in Iraq. " 

It is said that "an Italian company, and the Trevi Group, had negotiated with the Iraqi government to make some emergency repairs to the bridge, at a cost estimated at more than $ 380 million." Ended 29/35 b  

Link to comment
Share on other sites

%D8%B3%D8%AF%D8%A9-%D8%A7%D9%84%D9%85%D9

Helm of Mosul stands on its banks element of the Peshmerga forces - Z p

Twilight News / called on the Ministry of Water Resources on Thursday, three foreign companies for the Taataufer modern techniques in gloss plug connector that Western reports warned of collapse in the absence of maintenance sustain him in a practical and scientific.

He said the ministry consultant Mehdi Rashid said in a statement responded to Twilight News, "The ministry has developed in the priorities of the future plans for the rehabilitation of irrigation facilities that were damaged as a result of the control of terrorist gangs Daash them, including Ramadi Barrage and Nazim Warrar and after the re-edited by our armed forces and popular crowd, the ministry created a number of experts from its members for the purpose of bringing her back to service. "

Mehdi pointed to "Adama Overstuffing work of the foundations of the Mosul Dam by inviting 3 foreign companies for the purpose of securing the provision of modern technologies in ways Overstuffing and rehabilitation of the lower ports and respective personnel training on such techniques to be able to self-manage the process."

He said Mahdi "The ministry has developed within its implementation of COPD unequivocal priorities in the Shatt al-Arab / province of Basra to minimize the effects of the tongue, salted and revitalization of the marshes and compensate for the shortage of water imports during the previous years, as well as the work underway to prepare a report illustrates the advantage of Lake Rifai to promote the Euphrates River."

The US report warned on Monday that lax maintenance and repair in Mosul dam poses a threat to the lives of more than a million and a half Iraqi people.

The New York Times reported a report in which it said was 16 months after the liberation of Mosul Dam from the control of terrorists organization "Daash" There is a risk of collapse.

The report noted that if the dam collapsed, it is likely to be exposed and a half million people lives of million of those who dwell on the shores of the Tigris and Euphrates to the risk of death by drowning, as well as the displacement of a million people last.

The report pointed out that with the difference in height of the water level in the summer and spring, the number of victims of the dam will be uneven in these two chapters.

The report indicated that US President Barack Obama discussed in a telephone conversation with Prime Minister Haider al-Abadi latest developments in the war against "Daash", well that confirmed that the Mosul Dam need restoration.

The report noted that the Iraqi ambassador to Washington, Philly Luqman said that the Iraqi government has a contingency plan in case the dam collapsed.

Link to comment
Share on other sites

Mosul Dam

 

 

         

1/16/2016 0:00 

 BAGHDAD - morning 

and directed the Ministry of Water Resources to call three foreign companies for the purpose of securing new technologies in ways that Overstuffing fill Almousel.mschar ministry Mehdi Rashid said in a statement received »Sabah» copy of it: he «and under the direct supervision and field follow-up by the minister Mohsen al-Shammari, and put the ministry in priorities for future plans, the rehabilitation of irrigation facilities that were damaged as a result of the control of terrorist gangs (Daash) them, including Ramadi Barrage and Nazim Warrar after the re-liberalized by our armed forces and popular crowd »He pointed out that« the ministry has created a number of experts from its members for the purpose of bring it back into service , in addition to the maintenance work Overstuffing of the foundations of the Mosul Dam by inviting three foreign companies for the purpose of securing the provision of modern technologies in ways Overstuffing and rehabilitation of the lower ports and train involved in those technologies to be able to manage the process self ». 

As« put the ministry within its implementation of COPD unequivocal in the Shatt al-Arab priorities / Basra province to reduce the effects of the tongue, salted and revitalization of the marshes and compensate for the shortage of water imports during the previous years »He continued the statement that« the ongoing work to prepare the report shows the benefit of Lake Rifai to promote the Euphrates River ».oaad Mosul Dam biggest dams Iraq and the fourth largest dam in the Middle East recently it reported that exhibition due to corrosion in infrastructure to collapse but the Iraqi government has long denied these reports confirm the continuation of Amaaljtah.ivkr that the Italian company had completed all the procedures related to contract in order to complete maintenance of the dam containing the work Overstuffing and maintenance of the lower ports of Sd.aly that, Rashid announced «contracted the ministry with the agency and the US Geological Survey to be accurate in obtaining information in relation to the expectations of rainfall for the six days the next and the proportion of snow falling within the basins of the Tigris and Euphrates and the temperature and the percentage of water equivalent of snow after it dissolves, as that of this contract significant advantages in water resources management process In the current conditions of scarcity »adviser. He expressed hope that this year's rainy be moist to compensate for the shortage of water for the past imports in 2015 because of water scarcity and control gangs« Daash »irrigation work on terrorist facilities.

Link to comment
Share on other sites

Yota I love you and pray that you don't take this wrong but every time that you

 

post something about the Mosul Dam I get this sinking feeling in my heart. I know 

 

in my spirit that before ISIS looses Mosul they will blow that thing. And my heart 

 

pangs for those that will die in the horror. 

Link to comment
Share on other sites

 
 

24519.jpg?width=400&height=300&crop=auto

Abadi instructs the maintenance of the Mosul Dam

 

Author: 
Editor: BK 2016/01/16 21:23 Number of Views: 1346 

 

Long-Presse / Baghdad

The President of the Council of Ministers, Haider al-Abadi, on Saturday, to take all necessary measures for the maintenance of the Mosul Dam and keep it.

This came during an expanded meeting of the Prime Minister, today, with a group of experts and specialists in the Ministry of Water Resources and the advisers and universities in the presence of advanced Italian company for the maintenance of the Mosul Dam, according to a statement the media to his office, took over the (long-Presse) a copy of it.

Bureau reported in his statement, that "the meeting saw the discussion relating to the maintenance of the Mosul Dam and business procedures that were implemented to sustain," noting that it resulted in a "directive to take the necessary means and procedures, all of which will complete the maintenance work of the dam and keep it."

The Italian government, announced, in (the 16th of December 2015 the past), sending 450 soldiers to protect her company, which holds the maintenance of the Mosul Dam, while warning of the collapse of the dam, which provides water and electric power to more than a million people, confirmed that it is located adjacent to regulate areas (Daash).

The US president, Barack Obama, said during a conversation with the head of the Iraqi government, in, (the sixth of the current January 2016), the need for emergency restoration operations Mosul Dam.

The newspaper, The New York Times, The New York Times the US, in (the 11th of January the current), about the possibility of the death or displacement of more than 1.0005 million thousand Iraqis living on the banks of the Tigris, including the capital Baghdad, if it collapsed Mosul Dam, quoted Iraqi assertions officials the existence of a contingency plan to cope with such "disaster."

It is a plug connector (Saddam previously), about 50 km north of the city of Mosul (405 km north of Baghdad), was built in 1983 and has a three km long and 200 m in length, and a height of 131 m, and is the largest in Iraq, the fourth largest dam in the Middle East, But it turns out that it was held on the soil of a nature "unable" endurance, so it had to be injected foundations around periodically to ensure that its collapse, that process has started in the mid eighties of the last century, but did not communicate properly about after the year 2003.

 

Link to comment
Share on other sites

Like sandfly said, I see more us dollars going there.  Our embassy is in the threat also.  Thanks again to the maliki for stealing the funds of the country.  Man, when this freak goes down, it better be really down.  He has crippled a whole country lining his pockets and murdering ordinary folks.  

Link to comment
Share on other sites

add this, another requirement from the World Bank (IMF) on the loan...


So the World Bank to agree to give Iraq recently did not hesitate a loan of $ 1.2 billion on easy terms, on condition stop burning gas and stave off the collapse of the Mosul Dam, and all these things are in the end

 

,

Read more: http://dinarvets.com/forums/index.php?/topic/214496-iraqi-minister-the-financial-situation-in-the-central-bank-is-still-reassuring-and-has-50-billion/#ixzz3xVAJ35Dr

Link to comment
Share on other sites

Refresher....Here what we knew that was on the List for the Loan....


Posted 06 November 2015 - 05:29 AM

World Bank imposed on Iraq raise the ration support and increase fuel prices in exchange for the granting of loans 1446741281_8.jpgThe number of visits: 222 Published on: Yesterday, 19:34 Published by: Messenger Delphi   He said the House of Representatives Finance Committee member Ahmed Hama, Thursday, the World Bank pressure on the Iraqi government to pressure expenses provided access to financial loans is from the last payment to the application of the new salary ladder.   The flesh that "the Iraqi government had made earlier at the request of the World Bank for a soft loan, to overcome the financial crisis experienced by the country," pointing out that "the World Bank has sent advisers to the State Audit, and assessing the financial situation there."   "After brief the UN team offers a set of recommendations to the Iraqi government make clear reforms on salaries that exceed 70% of the country's total revenue, and drain all the capabilities of the Malian government, as well as the lifting of government subsidies for food in the ration card items, and also the removal of subsidies on fuel prices and oil derivatives. "   And between a member of the Finance Committee that "the government Abadi tried to avoid these steps initially, but the deterioration of the financial situation, and lower revenues recently paid for admission to undertake reforms, and so began the first procedure, a so-called ladder new salary, which is among the deep financial reforms that will pack approval in the coming days. "

Read more: http://dinarvets.com/forums/index.php?/topic/210899-world-bank-imposed-on-iraq-raise-the-ration-support-and-increase-fuel-prices-in-exchange-for-the-granting-of-loans/#ixzz3xVDBQ3Li

Link to comment
Share on other sites

History of edits:: 2016/1/22 15:41 • 150 visits readable
story_img_56a21c3128293.jpg
[Follow-where] 
the US State Department warned that Mosul dam could collapse if the required resources are not available, so the water will immerse many cities including Tikrit, Samarra and Mosul and the displacement of hundreds of thousands of people. "
The ministry said in a statement that hundreds of thousands of people may become homeless as a result of the collapse of the dam. 
"The Ministry of Water Resources said that the agreement with the Italian company for the purpose of Mosul dam maintenance has not yet. 
He said Mehdi Rashid ministry adviser, for [where]," not yet an agreement with the Italian company happen, but we are still phase of negotiations, "adding" there is no risk to the Mosul Dam 
"The prime minister Haider al-Abadi, chaired last Saturday, an expanded meeting with a group of experts and specialists in the Ministry of Water Resources and the advisers and universities in the presence of the Italian company Developed for the maintenance of the Mosul Dam. 
Mosul Dam biggest dams Iraq and the fourth largest dam in the Middle East it has reported recent reports that show due to corrosion in infrastructure to collapse but the Iraqi government has long denied these reports confirm the continuation of processing. 
The Italian company [Trevi] have completed all the procedures related contract in order to complete maintenance of the dam, containing the realization Overstuffing and maintenance of the lower ports to fill. 
The Italian Prime Minister Matteo Rinci declared in 16 of the last month his country's intention to send 450 troops from his country to Iraq to participate in the front lines in the face of Daash to protect the Italian company that will repair crew Mosul Dam. 
As explained Ministry of Water Resources, said that "the conditions set by the ministry, that the company provide special protection for its staff, any protection figures]," adding that "the dam locked by the Peshmerga forces and there is no problem" .anthy
Link to comment
Share on other sites

 

15397.jpg?width=400&height=300&crop=auto

Security forces in Mosul dam after the expulsion of the organization (Daash) thereof.

 

Author: 
Editor: 01/23/2016 23:10 Number of Views: 378 

 

 
 

Long-Presse / Baghdad

Parliamentarians connects the escalation of Washington's warnings about the dangers of the collapse of the plug connector with high frequency and the arrival of trained Americans to Iraq as part of the international coalition's efforts to fight Daash.

But experts locally, confirms that the Baghdad airport and the US embassy, ​​are considered more important interests and Washington fears their fate if the dam collapsed.

US concern about the status of the dam was clear when the army lifted his military headquarters were close to Mosul during the years of its presence in Iraq after 2003.

And a former government adviser asserts that the expected scenario of the collapse of the dam would be a "tsunami Japanese" New or above.

But the Iraqi government and local authorities of the connector, confirm that the status of the dam was "not serious", and Qllta of the value of the US warnings.

And it will result in the collapse of the dam, according to experts, to the sinking of cities: Mosul, Samarra, Baghdad, in a matter of hours. And it is expected to reach flood effects to Basra after the destruction of infrastructure and the undermining of water projects on the Tigris.

Daash days in the dam

The mystery surrounding the period in which they underwent the dam where the control Daash, and whether the reason for the re-ring the alarm bell collapse again.

Olokua says Abdul Rahman, a local official in Mosul, through contact with the (range), "we do not know what the gunmen did during the period of their presence in Mosul Dam. Did not communicate with one there."

Daash and occupied the dam for more than a month before re Peshmerga and the strength of the Iraqi anti-terrorism, and American air cover to regain control on 18 August.

He Olokua "in the period of the occupation of the militants of the dam, preventing most of the workers to leave the place while the rest fled."

And dealing with the foundations of the dam cracks, years ago, in a "concrete injection" daily and around the clock. Experts do not rule out damage to the dam after injected stopped during the period of control Daash it.

The expert says the Water Affairs Abdul Diab Aoun, a former adviser in the Ministry of Water Resources, said that "the imbalance in relation to one of the lower dam ports that the disposal of the water." He explained that "the treatment are injected fast tensioner Cement sclerosis, which after stuffing mixed with water and turn into a material Siala in the foundations of the dam."

The error in the construction of the dam dates back to its inception in the eighties of the last century, which was held on the land of "plaster" react with water and eroded quickly, according to the water committee in the House of Representatives.

For his part, says Diab, said in an interview with the (range), said that "11 excavator now working around the clock in the dam for the implementation of the clock injection process," but he asserts that "it is not enough to not collapse."

 

Backgrounds US concerns

After the return of the Peshmerga forces to take control of the dam again, most of the staff returned to their place of work. He says the Nineveh provincial council member Abdul Rahman Olokua "helped in the return of the staff, and Rmmna residential building for employees within the dam and which was damaged during the fighting in order to encourage them to work again."

And it reveals Olokua about "the existence of a group of Italian and American experts now in the dam to monitor on an ongoing basis."

The news leaked out last year about the existence of "military force" in the western perimeter of the dam in preparation for the Liberation of Mosul. But local administrator says that "those alleged power is to protect water experts."

For its part, says Sunrise Alabegi, a member of the Committee on Agriculture and Water in the House of Representatives, "The US escalated warnings about the collapse of the dam to coincide with the return of US troops to Iraq again and took the rules in the country within the international coalition to fight Daash".

And The Washington Post, pointed out in a previous report, about the seriousness of the collapse of the Mosul Dam, that "Obama urged Abadi in a telephone conversation on the maintenance of the dam."

The US Embassy is located in Baghdad on the banks of the Tigris River from the west side of the river, which is expected to sink within a few hours if the levels of the river suddenly rose, according to the former Ministry of Water Resources Advisor.

And see Diab, a former official at the Ministry of Resources, "What frightens the United States of Mosul dam water flow is not thousands of employees at the embassy only, but the Baghdad airport in which the number of US forces will destroy it exists because of the interruption of Baghdad from the outside world."

And this is seen by observers as hamper the evacuation of Americans troops or citizens inside Iraq for the moment the flood which portrays the former water resources consultant as "may exceed the tsunami that occurred in Japan in 2012".

Aoun is expected Abdul Diab that "Mosul sink immediately in the event of the collapse of the dam." "The water will immerse cities such as Tikrit and Samarra, and Baghdad during the four hours, and will destroy all the way in the flood water projects on the Tigris helm of Samarra, the most important of which would destroy the whole city."

The risk of flooding will be reduced as we head to the south and to the highlands, according to an expert on water affairs. But he says "will cross the water, especially in proximity to the sites of the Euphrates with the Tigris near Baghdad, and will extend the effects of the flood to Basra."

How will address the dam?

Former government adviser that describes padding the concrete dam which is subject to him, the "Prosthetic", calling for "a radical solution to end fears of the collapse of the dam," but admits that the difficulty of being a Asdtm financial crisis and the security situation.

The government has neglected, over the past years with a financial abundance, repair the dam or complete the dam "Badush" which stopped during the nineties due to the economic blockade. The dam Badush, repelling barrier to reduce the effects of the disaster in the first event of the collapse of the dam and turn it into a normal flood, according to the former official in the Ministry of Water Resources confirmation.

Abdon and advised to "reduce the water level in the Mosul Dam to below 330 meters above sea level and the diversion of excess water into Lake Tharthar as a temporary solution."

It was supposed to enter into Iraq contract with an Italian company for the maintenance of the dam, part of the World Bank loan of $ 200 million. The contract includes the dam injection intensively for a year with training Iraqi cadres to work after that, especially since the number of workers at the dam is not enough now, according to experts there.

Says Alabegi, a member of the parliamentary committee of water, "there are security risks Italian side wants to be added to the cost of the contract." But officials in Mosul confirmed (range) that "Daash far from the dam at about 60-70 km, and separating them Maholh populated villages."

According to the parliamentary water committee member, he said "the Ministry of resources has not signed the contract yet," pointing out that "the Italian company's previous projects have been carried out in Iraq." And predicted that there will be some "political interference" that made the minister linger.

Ministry of Water Resources has denied repeatedly, the US reports of an imminent collapse of the dam, and says it was operating normally.

The ministry revealed, recently, for negotiations with an Italian company to introduce modern technology in the field of maintenance of the dam.

Alabegi in turn, calls for a "comprehensive process to assess the status of the dam before being diagnosed with warnings or processors that may be outside the framework of constant injection concrete process to create other dams."

Mn..oail grace

 
 
Link to comment
Share on other sites

 

13259.jpg?width=400&height=300&crop=auto

Euphrates River in Najaf Imaging (Ala Reef)

 

Author: BS 
Editor: the AT, BS 2016/01/25 12:16Number of Views: 325 

 

 
 

Long-Presse / Baghdad

The Ministry of Water Resources, on Monday, the allocation of the necessary funds and in agreement with the World Bank for the maintenance of one of the unemployed in Mosul dam gates, and accused Turkey of causing the low water levels in the marsh and affected agricultural areas in Iraq, and as revealed to take several measures to prevent the excess water by farmers, showed that Basra, Maysan, Muthanna, Dhi Qar provinces most affected because of these abuses.

The Minister of Water Resources, Mohsen al-Shammari, hosted by the program (people and government), which broadcast channel (range), "The views expressed in the previous government on the Mosul dam maintenance was go around enhanced and strengthened, having to work a proposal maintenance Badush Dam to the lack of funds allocated to it, as it has become later not to check things and left the two dams without the maintenance and enhancement of operations, "pointing out that" the exchange of large amounts on such projects is not a loss because of its great benefits in the future. "

Shammari said, that "corruption Maatravq always with the presence of money, particularly in the contracts concluded on the maintenance of the dam," stressing "the need to have a signed contract with the companies that will take over maintenance and sober degree does not allow the infiltration of corruption him."

The al-Shammari, that "Mosul Dam will not collapse and raised on the subject is a malfunction in one of the gates of the dam, which is not about Pegrgah and collapse," noting that "the dam consists of four ports, a power station and lower emergency and ports," explaining that "it was the allocation of funds for the maintenance of the gate After the agreement with the World Bank. "

And on the rising drought and desertification in the country, between al-Shammari, that "Iraq does not suffer the order form rolling but there is a drop in water levels due to lack of water releases by Turkey, which caused the decline in agricultural areas," adding that "Turkey halted water releases in River Euphrates, last year, for a period of four months which affected so also in low water levels in the southern marshes. "

Shammari and that "the Turks promised compensation, but they did not live up to those commitments so far."

The Minister of Water Resources, said: "The Iraqi side has a local ones and other international programs, regarding negotiations with countries neighboring riparian with Iraq, especially after the agreement was reached with the Iraqi Foreign Baikal diplomatic work tasks Water Ministry in that regard because of the multiplicity and the weight of the files managed by the State Department," which , pointing out that "The ministry needs to be a few months until they are mature vision on Iraq incomplete rations of water and go towards Turkey to sign strategic agreements on that."

In a related context, al-Shammari said, "The ministry is keen to bring the largest possible area of ​​marsh and flooded with water after a water drop them from 60 to 30%, has been done by raising the water levels in the past two months to good levels," explaining that "some ports Water needs to be financial allocations for maintenance and ensure that no overtaking by the other. "

And between al-Shammari, that "overtaking on water quotas in the southern regions are in accordance with the two methods, one within the same province, and the second between the province and the other," pointing out that "Maysan and Basra, Muthanna, Dhi Qar most affected provinces because of the provinces that fall last one exceeded."

He said al-Shammari, that "overtaking on the water quotas for Aigv when some peasants and citizens, but that there are personalities and officials in the Iraqi government who have the Agricultural Land, practicing overtaking on the quota shares," asserting that "the ministry has taken several measures to prevent squatters, including the coordination with local governments and judicial role In addition to the adoption of the security forces in the implementation of these instructions and ensure no repeat it again. "

 
 
Link to comment
Share on other sites

Government discusses technical case Mosul Dam

 

 

         

1/27/2016 0:00 

BAGHDAD - morning 

gave the government great importance to placed Mosul Dam to ward off potential risks as well as on the use of international expertise in the largest treatment and the most important dams Iraq, while decided to launch earmarked for the Iraqi Media Network amount of the grant. 

A statement by the Presidency of the Council of Ministers received a «morning» copy of the Council of Ministers discussed in its regular, which on Tuesday was held, headed by Dr. Haider Abadi, the measures taken by the government to address the problem of the Mosul Dam and put the necessary plans by the problem the competent committees for this purpose,. 

The statement stressed move the government their proceedings and given the subject of the dam of extreme importance to ward off any potential risk and the use of international expertise in this area, at a time when the government demanded that the Ministry of Finance represented by the national retirement and ministries and authorities Authority is related to the Ministry to provide all the necessary facilities and assistance for the completion of pension transactions for employees displaced into account the circumstances. 

 The Ministry of Water Resources and described the news that circulated by some media about the possibility of the collapse of the Mosul Dam b «media hype», considering the purpose behind it is to disrupt the work of the Iraqi State 

and Council of Ministers decided that the Ministry of Finance allocated for the launch of the Iraqi Media Network in the federal budget for fiscal year 2016 through the Ministry of Finance and the amount of the grant.

Link to comment
Share on other sites

warn-655x360.jpg

EM

 

Twilight News / spokesman for the international coalition that the United States led by Steve Warren said he can ensure the arrest of the leader of al Daash Abu Bakr al-Baghdadi.

 

Warren said in an interview with the Iraqi Alsumaria pursued Twilight News that "the organization Daash is now in the position of defense, and Pat retreats and hiding in residential areas," adding that "air strikes on positions and strongholds Daash in the city of Mosul, continuing an almost daily basis."

 

He added that "the international coalition was able to destroy Daash after the bombing of a lot of the organization and the oil wells wheels and even banks," asserting that "the alliance will continue bombing and hit Daash, and I'm sure the defeat of the organization."

 

And about the fate of the leader of "Daash" Abu Bakr al-Baghdadi, Warren said that "al-Baghdadi was a bad person, turning to an evil person now," pointing to "I can guarantee that the arrest of al-Baghdadi."

 

In another aspect of modern Warren she said, "We are very concerned about the Mosul Dam and maintenance, and the US Embassy in Baghdad, spoke on the subject".

 

"Currently we do not know the timing of the collapse of the dam," pointing out that "the Iraqis should understand that there is an imminent danger Mosul Dam" says Ran.

Link to comment
Share on other sites

Resources: gloss foundations of the Mosul Dam ensure that its collapse

 

 

         

1/28/2016 0:00 

 Baghdad, Ahmed Abed Rabbo 

confirmed the Ministry of Water Resources said the continuing foundations of the Mosul Dam businessman Overstuffing is what ensures that Anhiarh.ovi time revealed continues to negotiate with the Italian company for rehabilitation, called living on the banks of the river to be careful in case of any emergency.  

The ministry adviser and director of the General Authority Dams and reservoirs in the ministry Mehdi Rashid Mahdi said in a statement »Sabah»: The negotiations with the Italian company for the purpose of rehabilitation of the Mosul Dam, is still continuing, adding that the maintenance and Overstuffing acts in its walls sustained by the cadres of the ministry under the supervision of experts and specialists in the field of dams. 

The dam is located on the course of the Tigris River, 50 km north of the city of Mosul, and finished construction was in 1986 by two German and Italian, with a length of three kilometers and 650 meters and a height of 131 meters, and includes a lake storage capacity of more than 11 billion cubic meters of water. 

He said Mahdi The ongoing work of Overstuffing which began in 1986 and so far around the clock, is what ensures that its collapse, surprising at the same time of hype and media news stories about the collapse of Sud.uesthoz Mosul Dam on the great interest by officials and specialists as one of the largest dams in the country and the fourth in the Middle East, but it is suffering at the present time the problem of ground erosion, which established it as it is valid, requires strengthening founded by day through Overstuffing injection by concrete to keep his body from collapse. 

promised the ministry of information talked about the collapse of the dam «incorrect adviser» , adding that the purpose is to create a crisis in the country, noting that his ministry is the competent authority and informed fully the conditions of the dam and have the information confirmed. 

He also stressed that the water in the dam amounts are relatively low compared to the energy-carrying him, who noted that this decline within the ministry plans to keep it from Alanhiar.ahar that the Council of Ministers to monitor the beginning of last year, 10 billion dinars for the rehabilitation of the Mosul Dam, but the Minister of Water Resources revealed the allocation of other amounts from the ministry's budget for the same purpose. 

He predicted Mahdi to witness the Tigris River, the passage of water wave will raise Mnasiba as a result of snow The rainfall in the river basin Zab up and down during the next term, pointing out that they may affect the plants and houses built on the banks of the river or overlooking the Hodah.ouhdhir who dwell within the banks of the river from the flood risk due to rising water levels, asking them to move to Almertfat.oakhadda dam the control of the security forces and the Peshmerga after its liberation from the organization «Daash» terrorist by more than Aam.ccant ministry has sent international experts have conducted extensive statements on the walls of the dam, to check on him, as all the reports they have prepared collapse excluded. The Minister for Water Resources Mohsen al-Shammari more than a field visit to the Mosul Dam, accompanied by Advanced angel in Wazzarh.onaakec cabinet last Tuesday the actions taken by the Government to address the problem of «Mosul Dam» and put the necessary plans by the competent committees .. The continued actions as the subject of the dam to him critical to ward off any potential risk with the use of the necessary international expertise in this Amajal.okan Prime Minister had met with a group of experts and specialists in the Ministry of Water Resources and the advisers and universities in the presence of advanced Italian company for a project Mosul dam maintenance, as the meeting discussed measures relating maintained by the work carried out To do that, the necessary means and procedures that will conclude the work of maintenance and keep it.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.



  • Testing the Rocker Badge!

  • Live Exchange Rate

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.